Shopping security
Expected Delivery Q4 2026 (Subject to Change at Manufacturer's Discretion).
3802 will have a BR black livery with the BR Early Crest on the tender side. It will have a curved footplate drop at the front of the locomotive, parallel buffers, a large pony truck bell cover and the top front lamp bracket will be mounted on the smoke box door. This locomotive has outside steam pipes and a small boiler cradle. It has the Collett cab with the sand boxes situated forward of the cab. The boiler is crowned with a tapered chimney and small safety valve bonnet and fire iron cover. 3802 will be paired with a riveted tender.
The GWR prototype 2-8-0 locomotive 2800 (originally No 97) was built in 1903 and underwent two years of trials before further production began which resulted in 84 of the class being built. The design was much in advance of its time and this class and the slightly modified 2884 class were built from 1903 until 1942. They remained the standard freight design on the GWR for the rest of the Company’s existence and were used on the heaviest freight trains.
General Specification
The locomotive will have all of the usual refinements that are expected to be found on all Dapol models including:
Technical Specification
Ships within 48 hours · Estimated delivery Jun 22 - Jun 27
US$40
Get nowSign up to your membership to get coupons up to
15%
Get nowOpportunity to enjoy order discount up to 15% off
Top-Converting Item to Boost Your Average Order