20% OFF shipping at loriwymancasting.com on orders over $79 + up to 10% OFF products
loriwymancasting.com
home > R40166B GNER Mk4 Standard Coach C 12444 > R40166B GNER Mk4 Standard Coach C 12444
download picture
R40166B GNER Mk4 Standard Coach C 12444Built at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push button operated plug type doors, fully sealed gangways and
Shopping security

Shopping security

Each payment you make on thelockerguy is secured with strict SSL encryption and PCI DSS data protection protocols

Built at Metro-Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push-button operated plug-type doors, fully sealed gangways and a designed top speed of 140mph. Much of the Mk4 design was based upon the Advanced Passenger Train. In particular, Mk4 coaches feature sides profiled to allow a tilt of up to 6° with newly fitted tilting bogies.

Mk4s entered service in 1989 and helped drive a significant increase in passenger traffic. With privatisation in 1996, all Mk4 coaches were sold to Evershot Rail Group who have since leased them out to the holder of the InterCity East Coast Franchise. The franchise was initially awarded to Great North Eastern Railway (GNER) and has since been operated by National Express East Coast, East Coast, Virgin Trains East Coast and London North Eastern Railway (LNER) owned by the Department for Transport.

Between October 2003 and November 2005 Bombardier Transportation, under contract from GNER, commenced refurbishment of the Mk4 stock, fitting new seating arrangements and introduced onboard Wi-Fi, a first for British rail services. This refurbishment programme was called 'Project Mallard' named after the Mallard steam locomotive, built in the 1930s by the London & North Eastern Railway and holder of the world speed record for steam locomotives.

Although Mk4 coaches have spent most of their lives on the ECML, there are plans to cascade them down to other lines due to the introduction of the Class 800 and Class 801 IEPs.

  • Item Length - 33cm, Width - 3.5cm, Height- 5cm
  • 1:76 Scale 00 Gauge
  • Painted Finish
  • Minimum Curve (mm): Radius 2
  • Number of Parts: 1

R40166B GNER Mk4 Standard Coach C 12444

Item no : 41199673303
sold recently : Login >>
US$ 24.50
Pay in 4 interest-free payments of $6.12 Learn more
Min. order: 1piece

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jun 20 - Jun 25

Enjoy 20% off shipping

US$ 24.50

1-11

US$ 22.05

12-35

US$ 17.15

36-59

US$ 14.70

60+

US$40

Get now

Sign up to your membership to get coupons up to

15%

Get now

Opportunity to enjoy order discount up to 15% off

Please add the products
Shipping Notes
  • Free Standard Shipping on $100+ Orders to the USA.
  • Except Preorder products are shipped in 48 hours.
  • Delivery to the USA:
  1. Standard Shipping : 3-10 business days
  • If time is of the essence, please consider selecting expedited delivery for faster service.
Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

Discover Niche Categories That Outsell

Top-Converting Item to Boost Your Average Order

recommand products

Related Searches